• Skip to main content

No Salem Data Center

Willamette Valley Neighbors

  • Home
  • FAILED APP #1
    • Completeness Review deficiencies list
    • Site and Horizontal control deficiencies 1
    • Planting Plan deficiencies 1
    • Callouts
    • Site and Horizontal control deficiencies 2
    • Grading and Drainage deficiencies
    • Site Utility plan deficiencies
    • Private Utility deficiencies
    • Stormwater details
    • Planting Plan deficiencies 2
    • Stormwater report callouts
    • Sub Basins deficiencies
    • Executive summary deficiencies
    • Hydroflow analysis deficiencies
  • Site plan
    • Cover, sheet index, notes and campus plan
    • Existing conditions and demolition plan
    • Erosion control phase 1
    • Erosion control phase 2
    • Site and horizontal control plan
    • Grading and drainage plan
    • Site utility plan
    • Private utility plan
    • Site stormwater, utility, erosion and sediment control details
    • Irrigation plan, irrigation schedule and notes
    • Planting plan, planting schedule and notes
  • About
  • News
  • Resources
    • Lyon Township
    • Verrus
  • Contact

C0.0-C0.3 Cover, Sheet index, General notes, Campus plan

C1.00-C1.18 Existing conditions and demolition plan

C2.00-C2.18 Erosion control phase 1

C2.19-C2.37 Erosion control phase 2

C3.00-C3.18 Site and horizontal control plan

C4.00-C4.18 Grading and drainage plan

C5.00-C5.18 Site utility plan

C6.00-C6.18 Private utility plan

C7.00-C7.06 Site stormwater, utility, erosion and sediment control details

L3.00-L3.19 Irrigation plan, irrigation schedule and notes

L4.00-L4.19 Planting plan, planting schedule and notes

Copyright © 2026 · Altitude Pro on Genesis Framework · WordPress · Log in